English Русский

Shanghai Yixing Technology Co., Ltd.

contact@yxplasticmolding.com

  • Home
  • About us
    • injection workshop
    • mold machining work shop
    • our client
  • products
    • custom plastic injection mold
      • customized injection mold
      • customized rotational mold
    • custom plastic injection molding parts
    • custom stamping mold
    • custom die casting mold
  • Service
    • 3d scanning
    • 3d printing
    • Mold design
    • mold making
  • Mold test Video
  • Case sharing
    • new mold case
    • injection common sense sharing
  • F.A.Q
  • Contact us

injection common sense sharing

  1. Home
  2. Case sharing
  3. injection common sense sharing
  4. How to install the plastic ventilation p...

How to install the plastic ventilation pipe correctly

How to install the plastic ventilation pipe correctly?
How to install the plastic ventilation pipe correctly? Plastic ventilation pipes are used in many industries, but if you want to install them yourself, you must learn the correct installation process for a long time. To avoid unnecessary mistakes.
Air duct assembly: the short air duct can be assembled on the ground at one time, and the long air duct can be assembled in sections according to the situation of the installation site. During assembly, the center degree and levelness of air duct shall be adjusted as much as possible to avoid air duct distortion or up and down wave, left and right swing dragon, each section of air duct shall not exceed 10m. During assembly, the gasket shall be leveled, the flange bolt shall be tightened evenly, and the nut cap shall face the same direction.
Air duct in place: first check the water level, elevation and firmness of all supports. In general, two methods are used to place the air duct: direct and spreader. If the cross-section of the air duct is small and low, the manual positioning method can be used, only the simple scaffold can be erected. When the cross-section of the air duct is large and the pipe section is long, the pulley, chain block, rope and other methods can be used for hoisting. In order to facilitate the positioning of air duct, the method of hanging the air duct on the scaffold and then lifting it on the air duct support is generally adopted. The scaffold shall be erected along the length direction of its air duct, and the height and position shall be suitable for construction operation. The hoisting sequence shall be from main pipe to support and riser.
The air duct shall be straightened, the air duct placed on the bracket shall be straightened, the horizontal and flat position of the air duct shall be adjusted, and then fixed according to the requirements of the atlas

Related News

Physical Properties of Plastics(2)

Physical Properties of Plastics(2)

Plastic color matching jobs

Plastic color matching jobs

mold design

mold design

How to solve the plane parts problem

How to solve the plane parts problem

Relationship between plastic internal stress and injection molding parts​

Relationship between plastic internal stress and injection m

principle for plastic injection exhaust system

principle for plastic injection exhaust system

Categories

  • new mold case
  • injection common sense sharing

Links

Google.comyxplasticmolding.com

custom injection mold

custom stamping mold

LatestPost

  • curved parts injection mold test
    2023-07-07
  • pipe fitting Tee and Cap Mold test
    2023-07-06
  • mold making 3
    2023-07-05

Feedback

Contact Us

109353593

+8615000908770

+86 21 51662821

contact@yxplasticmolding.com

yanahe

Room 230, building 15, 6066 Songze Avenue, Qingpu District, Shanghai

wechat

Copyright © 2013-2022 Shanghai Yixing Technology Co., Ltd. All Rights Reserved.

  • Skype.
  • E-mail
  • Whatsapp
  • Inquiry
Inquiry Us Now !
Inquiry Us Now !